Battery R&D Facility Dry Room

Case Study

Location: Bedford, MA

Size: 2,000 ft²

Download Case Study

Timeline


Aug. 2023

Dec. 2023

Jan. 2024

Rooms Constructed

Order Confirmed

Final Handover

Beginning Construction

During Construction

After Construction

Project Highlights

  • Fit pre-engineered room and mechanical package in existing building (commercial office space) with minor modifications to accommodate existing building items and installation challenges.

  • Indoor DHU location for energy efficiency, performance and serviceability.

  • Mechanical start-up and commissioning was accomplished in one week with room out-performing design specifications.

  • Worked with client to include more integrated power posts and limited wall mounted utilities for cleanliness, appearance, and project flexibility.