Case Study:
Electronics Clean Area Isolation System
Size: 420 ft²
Location: Harvard, MA
Timeline: 3 months
Overview
Airtho was contracted to design and construct an isolated clean area within an existing office and laboratory environment. The goal was to create a positively pressurized ISO 7 space that integrated seamlessly with the building’s layout while utilizing existing walls, infrastructure, and conditioned plant air. The project involved building upgrades, installation of an Intelligrid™ ceiling, HEPA filtration, and final ISO certification.
Challenge
The project required constructing a clean environment within fully occupied, existing building conditions. Key challenges included:
Fitting a custom cleanroom layout into the existing room geometry
Coordinating isolation upgrades using existing walls, doors, and airlock
Implementing a new Intelligrid™ ceiling system inside a limited-height space
Ensuring proper HEPA filtration airflow while maintaining positive pressurization
Executing work efficiently in an active facility with minimal disruption
These constraints required precise design coordination and an installation sequence adapted to the unique site.
Solution
Cleanroom Architecture & Finishes: Airtho upgraded the existing room utilizing non-shedding epoxy coatings on existing walls and doors, NUDO wall cladding applied throughout defined areas, and integration of existing flooring and architectural components.
Intelligrid™ Ceiling System: A custom Airtho Intelligrid™ Light-Duty (LD) ceiling system was installed, including 4'×4' gasketed ceiling grid, LED flat-panel lighting, and threaded rod hanger system coordinated with existing structure.
HEPA Filtration & Airflow Performance: To achieve ISO 7 at-rest conditions, the clean are was equipped with one 3000 CFM Airtho HEPA Hub Fan Unit, two 4’×4’ FRM media HEPA filters, a low-wall return directly connected to the HEPA Hub, and adjustable makeup air damper supplied from conditioned plant air. This configuration provided over 65 ACH, ensuring consistent cleanroom performance.
Installation & Coordination: Airtho provided turnkey installation, including ceiling removal, wall prep, and cladding, Intelligrid™ build-out and HEPA Hub placement, lighting integration, flex duct connections, baseboard installation, and finishing work. Installation was completed in a single coordinated phase per the project plan.
Certification & Testing: This project concluded with third-party testing to verify ISO 7 cleanliness at rest and positive pressure to surrounding space.
Results
Fully functional ISO 7 clean area integrated into the existing facility
Effective isolation using upgraded finishes, Intelligrid™, and HEPA Hub system
Clean architectural fit with existing airlock and room layout
Achieved positive pressurization and airflow performance requirements
Completed project delivered with client satisfaction and certification approval