Timeline
June 2021
Dec. 2021
Jan. 2022
Rooms Constructed
Order Confirmed
Final Handover
Project Highlights
-
Locating the DHU directly on top of the room created an efficient ductwork design.
Paired with high-efficiency terminal HEPA filters, the design created a system with 2.5” total external static pressure.
-
Full submittal package in 2 weeks.
Delivery of room components within 3 months from PO.
-
Super Steel™ supported the critical loads of Airtho’s dry room package without any required upgrades to the building.
Located in a mixed-use facility, Airtho aligned access to the walkable plenum cap directly from the existing second floor offices for ease of access.